Formation Integrity Test (FIT)

Formation Integrity Test (FIT) is the method toPressure required for FIT = (14.5-9.2) x 0.052 x
test strength of formation and a casing shoe by4000 = 1102 psi
increasing Bottom Hole Pressure (BHP) toNote: The acronyms are listed below;psi = pound
designed pressure. FIT is normally conducted toper square inchppg = pound per gallonft = feet
ensure that formation below the casing show willFormation Integrity Test (FIT) procedures are as
not be broken while drilling the next section withfollows;
higher bottom hole pressure. Normally, drilling1. Drill out new formation few feet, circulate
engineers in town will design how much formationbottom up and collect formation samples to
integrity test pressure required and a unit of FITconfirm that new formation is drilled to and then
is normally in pound per gallon unit.pull a drill string into the casing shoe.
How to Calculate Pressure Required for Formation2. Close annular preventer or pipe rams, line up a
Integrity Test.cement pump, and circulate through an opened
Before forming formation integrity test, youchoke line to ensure that surface line is fully filled
should know pressure required for Formationwith drilling fluid.
Integrity Test. The formula showed below3. Stop the pump and close a choke valve.
demonstrates you how to calculate required FIT4. Gradually pump small amount of drilling fluid into
pressure.a well with constant pump strokes and
Pressure required for FIT (psi) = (Required FIT inrecommended pump strokes are 5 to 10 strokes
ppg - Current Mud Weight in ppg) x 0.052 x Trueper minute. Record total pump strokes, drill pipe
Vertical Depth of shoe in feetpressure and casing pressure. Pump until casing
Example below demonstrates how to use thepressure reaches the pressure required for
formula to calculate pressure required for theformation integrity test. Stop pumping and hold
test:pressure for few minutes to confirm pressure
Required FIT (ppg) = 14.5stability.
Current mud weight (ppg) = 9.25. Bleed off pressure and open up the well. Then
True Vertical Depth of shoe (ft) = 4000 TVDstart drilling operation.